Lane Closure on Highway 45 Postponed

The Mississippi Department of Transportation (MDOT) would like to update motorists on a previously scheduled lane closure on Highway 45 in Lee County.

The previously scheduled lane closure for today has been postponed due to weather conditions. MDOT will update motorists on the new date as information becomes available.

The closure was to allow the installation of the first 3.5 mile section of a larger 20 mile cable barrier project.  Once a new date is set, the barrier will be installed along Highway 45 from the Eason Boulevard interchange to the Verona exit. There will be subsequent closures of the inside lanes from Eason Boulevard to Main Street and then to McCullough Boulevard as each section’s grade work is completed. The project was awarded to Simmons Erosion Control of Lake, MS at the cost of $3,439,494.29.

For the most up-to-date information in your area, please visit www.MDOTtraffic.com and sign up for your traffic alerts.  Also, visit http://www.MDOTtraffic.com/mobile to get the latest traffic information from MDOTtraffic.com on your mobile device. MDOT advises the public to pull off the road to a safe location if you need to check the MDOTtraffic.com website while driving. MDOT’s number one concern is the safety of the traveling public.